We will do our best for customer satisfaction based on the best service and technology.

100A All-in-one Sleeve
Area of use
Non-metal pipe with floor penetration
Approved content
2 hours of the fire protection
Highlights
① PVC floor in PD
② As it is all-in-one sleeve, the sleeve and the firestop material can be installed at once
Composition
All-in-one sleeve firestop